- Increased Sales volume by 300%
- Increased Manufacturing throughput by 60% using Lean Mfg Techniques
- Secured large business accounts such as AutoZone, Advanced, Transtar, NAPA and LKQ
- Reduced Transmission finished goods inventory from 1.1M to 400K
- Introduced Kan-Ban process controls on all raw materials
- Introduced Standardized Work Centers for all transmission lines
- Reduced direct labor by 55% through optimizing process controls
- Implemented value stream mapping on all custom designed production cells
- Improved Warranty Quality from 28% to 6% utilizing PDCA techniques
- Reduced plant space utilization by 20% through live broadcast build to order system
- Implemented World Class 6S Program for All manufacturing sites and restocking locations.